The Concept of "Process Entitlement" Drives Record Performance

During Lean Six Sigma Yellow Belt training, we introduce the concept of "process entitlement" as a way to drive record performance. Using a simple process simulation with building blocks to make pyramids, we lead a class discussion on what level of performance would be possible if the process was perfect. Perfect is defined as no waste, no variation, no constraints, etc. Collectively, we arrive at a general consensus of the natural physical limits of the process -- the maximum number of pyramids that could be constructed in a 5 minute production period. Then we steer the discussion toward the topic of, "What would have to be different to produce at a rate equivalent to the natural physical limit?" At some point during this discussion, we challenge the students with concepts such as Takt time and process metrics. Then, we reveal the current world record and set production goals somewhere above the current record and below the maximum number possible. The record seems to inch higher with every new class and currently stands at 74 (with a competitor team in the same class producing 73).

Comments

Popular posts from this blog

Society of Professional Hispanic Engineers Lean Six Sigma Workshop

Key Performance Indicators in a Nutshell

Priming the Project Pump: Lean Six Sigma on a Shoestring